Tuscarora Tunnel is a major project completed by WWLLC in 2020 on the Pennsylvania Turnpike. We are a subcontractor/supplier to Thoroughbred Construction group. This project consist of the total refurbishing of the Tuscarora Tunnel located on the Pennsylvania Turnpike.
We are happy to supply a wide range of electrical products including but not limited to conduit, fittings, cables, junction boxes, generators, transfer switches, channel struts and lattice girders.
This wide range of electrical construction material and structural steel highlights the versatility and added value that Weatherspoon & Williams brings to the table.
Please do not hesitate to contact us for your small and large needs for electrical construction material and structural steel. All material can be procured and delivered on our long-term lease trucks along with facilitating the enormous coordination in shop drawings necessary for a project this size. Our contract on this project proceeded 9 Million Dollars.